PRE-SPRING RANCH RAIL SALE

KENTUCKY BLACK RAIL - 4 RAIL $13.99 FT. - 3 RAIL $11.99 FT. - 2 RAIL $9.99 FT.(300 ft minimum order.) - WHITE 3 RAIL - $11.99 FT. Coming soon ---- New price saving privacy fences to replace Bufftech Lexington styles ---

Spring Sale Going On Now!

- Update: We are now accepting orders for most all Bufftech Timber Grain and Certablend Residential fence styles. Lead-time 3 weeks. Black 3 rail horse fence $12.49 per ft.3 Rail Pasture Rail Horse Fence $9.99 ft. (not available in all areas 500 ft. minimum order)Lexington Privacy Fence $27.37 Complete.Allegheny Privacy Fence $59.99 per ft. COMPLETE.Sherwood Privacy Fence $62.00 Complete. - 4/1/23 Realistic Woodgrain Bufftech Timber Grain 2, 3 and 4 rail horse fences are back in production in 4 colors. - We are now accepting orders for most all Bufftech Timber Grain and Certablend Residential fence styles. Lead-time 3 weeks. Black 3 rail horse fence $12.49 per ft.3 Rail Pasture Rail Horse Fence $9.99 ft.Lexington Privacy Fence $27.37 Complete.Allegheny Privacy Fence $59.99 per ft. COMPLETE.Sherwood Privacy Fence $62.00 Complete. 4/1/23 Realistic Woodgrain Bufftech Timber Grain 2, 3 and 4 rail horse fences are back in production in 4 colors.
Important notice: There will be a price increase on many items effective 5/1/21. Please act by Friday, May 30 on any orders in progress to lock in any prices.
All Bufftech fence styles have matching gates. You can choose single walk thru or double wide drive thru gates with a choice of sizes. We will go over the choices with you when we place your order.

Scroll Down the page for Dimensions, Gates and More Details

Product Details:
Style: Privacy
Fence Colors: White, Almond
Fence Height: Fence Section Transitions from 6' to 4'
Picket Size: 7/8" x7" Tongue & Groove
Picket Spacing: N/A
Rails: 2" x 6" Deco x 94" (Ribbed)
Steel Reinforcement Rail: Bottom

Chesterfield S Curve Privacy Fence

$787.06$866.51

Pickets must be field cut. S Curve posts are standard Chesterfield posts
Posts included are 1 5x5x107″ post & cap and 1 5x5x84″ post & cap

*Quote Subtotal on Next Page

Bufftech offers a functional yet stylish way to change the height of your fence with our Swoop and S Curve 8 foot wide fence sections. This is a wonderful style option for ending a fence run or transitioning from 4 ft. high privacy fence to 6 ft. high or from 6 ft. high to 4 ft. The graceful curved top rail adds a unique signature to any privacy fence project. This option is available for both Chesterfield and Lexington fence styles in both Almond and white.

* Our price per foot includes posts, caps, rails and all the pickets, picket caps and stainless steel fasteners (galvanized steel inserts on selected styles). When comparing prices with our competitors, be sure that ALL components are included.

Pickets must be field cut. S Curve posts are standard Chesterfield posts
Posts included are 1 5x5x107″ post & cap and 1 5x5x84″ post & cap

Specifications

Privacy – Chesterfield S-Curve – Vinyl Fence Specifications

Fence Section Transitions from 6 feet to 4 feet | 8 feet wide